{"id":3370,"date":"2023-05-25T14:57:05","date_gmt":"2023-05-25T14:57:05","guid":{"rendered":"https:\/\/thenortherngazette.com\/?p=3370"},"modified":"2023-05-25T14:57:05","modified_gmt":"2023-05-25T14:57:05","slug":"border-roads-on-indo-china-border-in-pithoragarh-on-fast-track","status":"publish","type":"post","link":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/","title":{"rendered":"Border roads on Indo-China border in Pithoragarh on fast track"},"content":{"rendered":"<p>Border roads on Indo-China border in Pithoragarh on fast track<\/p>\n<p>B.D.Kasniyal<\/p>\n<p>Pithoragarh, May 25<\/p>\n<p>The border road between Munsiyari to Milam, the 66 km long\u00a0 road linking\u00a0the\u00a0last border posts\u00a0on the Indo -China border in Johar valley of Pithoragarh district, could be completed by\u00a0June 2024 as a seven km long hard rock portion\u00a0is posing problems in road cutting said Vimal Goswami, Chief Engineer of project \u2018Hirak\u2019 of Border Roads Organisation (BRO).<\/p>\n<p>&#8220;We have completed 28 km work from Milam side and 21 km from Munsiyari side, as the work on the road is being done from two sides,&#8221; said the BRO officer.<\/p>\n<p>Giving details of other border roads up to last security posts on the Indo-China border in Kumaon region, the \u2018Hirak\u2019 project chief said that besides this road,\u00a0two other border roads, namely Pithoragarh to Lipulekh and Gunji to Jolingkong are under construction or widening process in the region while one road, the 215 km long Jauljibi-Munsiyari-Birthi-Sama-Kapkot -Bageswar to Baijnath road has been sanctioned under the \u2018Bharat Mala\u2019 project.<\/p>\n<p>&#8221; The Rs 3000 crore worth estimated road from Baijnath in Bageswar district will link at Jauljibi on Pithoragarh- Lipulekh road after completion. The road will be constructed in 7 packages, each of which will be of Rs 400 crore worth,&#8221; said the BRO, officer.<\/p>\n<p>&#8220;We hope the alignment plan of this could be completed in 3 months time from now after the survey work complete,&#8221; said Goswami.<\/p>\n<p>Giving information on main border road to Indo china border in Kumaon region, namely the Pithoragarh to Lipulekh road, the \u2018Hirak\u2019 project chief engineer said that except in some portion from Baluakot to Tawaghat, where land acquisition for widening work has not been completed and a four km long portions from Tawaghat to Ghatiabagar where the road is passing through inner portions of villages, rest of the road is near completion as per the double lane standards of national highways . &#8220;Due to proposed tunnel between Bundi to Garbiyang, we have constructed the \u00a0road on this 37 km portion, as a single lane between two places, while the last 5 km portion of road, from KMVN huts to Lipulekh pass is awaiting army permission to complete the work,&#8221; said the BRO officer.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Border roads on Indo-China border in Pithoragarh on fast track B.D.Kasniyal Pithoragarh, May 25 The border road between Munsiyari to Milam, the 66 km long\u00a0 road linking\u00a0the\u00a0last border posts\u00a0on the Indo -China border in Johar valley of Pithoragarh district, could be completed by\u00a0June 2024 as a seven km long hard rock portion\u00a0is posing problems in &hellip;<\/p>\n","protected":false},"author":4,"featured_media":3371,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,33,91,56,59],"tags":[959,1313,1314,376,1315,1316,1303],"class_list":["post-3370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-international","category-national","category-politics","category-uttarakhand","tag-border-roads-organisation-bro","tag-chief-engineer","tag-hirak-project","tag-ind-china-border","tag-munsiyari-to-milam-road","tag-pithoragarh-lipulekh-road","tag-vimal-goswami"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette\" \/>\n<meta property=\"og:description\" content=\"Border roads on Indo-China border in Pithoragarh on fast track B.D.Kasniyal Pithoragarh, May 25 The border road between Munsiyari to Milam, the 66 km long\u00a0 road linking\u00a0the\u00a0last border posts\u00a0on the Indo -China border in Johar valley of Pithoragarh district, could be completed by\u00a0June 2024 as a seven km long hard rock portion\u00a0is posing problems in &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\" \/>\n<meta property=\"og:site_name\" content=\"Northern Gazette\" \/>\n<meta property=\"article:published_time\" content=\"2023-05-25T14:57:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"780\" \/>\n\t<meta property=\"og:image:height\" content=\"1040\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"The Northern Gazette Desk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"The Northern Gazette Desk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\"},\"author\":{\"name\":\"The Northern Gazette Desk\",\"@id\":\"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4\"},\"headline\":\"Border roads on Indo-China border in Pithoragarh on fast track\",\"datePublished\":\"2023-05-25T14:57:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\"},\"wordCount\":373,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg\",\"keywords\":[\"Border Roads organisation (BRO)\",\"Chief Engineer\",\"Hirak project\",\"Ind-china border\",\"Munsiyari to Milam road\",\"Pithoragarh-Lipulekh road\",\"Vimal Goswami\"],\"articleSection\":[\"Featured\",\"International\",\"National\",\"Politics\",\"Uttarakhand\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\",\"url\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\",\"name\":\"Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette\",\"isPartOf\":{\"@id\":\"https:\/\/thenortherngazette.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg\",\"datePublished\":\"2023-05-25T14:57:05+00:00\",\"author\":{\"@id\":\"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4\"},\"breadcrumb\":{\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage\",\"url\":\"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg\",\"contentUrl\":\"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg\",\"width\":780,\"height\":1040,\"caption\":\"Vimal Goswami, Chief Engineer, Hirak Project of BRO.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/thenortherngazette.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Border roads on Indo-China border in Pithoragarh on fast track\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/thenortherngazette.com\/#website\",\"url\":\"https:\/\/thenortherngazette.com\/\",\"name\":\"Northern Gazette\",\"description\":\"News Portal\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/thenortherngazette.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4\",\"name\":\"The Northern Gazette Desk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g\",\"caption\":\"The Northern Gazette Desk\"},\"url\":\"https:\/\/thenortherngazette.com\/index.php\/author\/the-northern-gazette-desk\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/","og_locale":"en_US","og_type":"article","og_title":"Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette","og_description":"Border roads on Indo-China border in Pithoragarh on fast track B.D.Kasniyal Pithoragarh, May 25 The border road between Munsiyari to Milam, the 66 km long\u00a0 road linking\u00a0the\u00a0last border posts\u00a0on the Indo -China border in Johar valley of Pithoragarh district, could be completed by\u00a0June 2024 as a seven km long hard rock portion\u00a0is posing problems in &hellip;","og_url":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/","og_site_name":"Northern Gazette","article_published_time":"2023-05-25T14:57:05+00:00","og_image":[{"width":780,"height":1040,"url":"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg","type":"image\/jpeg"}],"author":"The Northern Gazette Desk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"The Northern Gazette Desk","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#article","isPartOf":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/"},"author":{"name":"The Northern Gazette Desk","@id":"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4"},"headline":"Border roads on Indo-China border in Pithoragarh on fast track","datePublished":"2023-05-25T14:57:05+00:00","mainEntityOfPage":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/"},"wordCount":373,"commentCount":0,"image":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage"},"thumbnailUrl":"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg","keywords":["Border Roads organisation (BRO)","Chief Engineer","Hirak project","Ind-china border","Munsiyari to Milam road","Pithoragarh-Lipulekh road","Vimal Goswami"],"articleSection":["Featured","International","National","Politics","Uttarakhand"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/","url":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/","name":"Border roads on Indo-China border in Pithoragarh on fast track - Northern Gazette","isPartOf":{"@id":"https:\/\/thenortherngazette.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage"},"image":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage"},"thumbnailUrl":"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg","datePublished":"2023-05-25T14:57:05+00:00","author":{"@id":"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4"},"breadcrumb":{"@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#primaryimage","url":"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg","contentUrl":"https:\/\/thenortherngazette.com\/wp-content\/uploads\/2023\/05\/BROhirak-chief-engineer-1.jpg","width":780,"height":1040,"caption":"Vimal Goswami, Chief Engineer, Hirak Project of BRO."},{"@type":"BreadcrumbList","@id":"https:\/\/thenortherngazette.com\/index.php\/2023\/05\/25\/border-roads-on-indo-china-border-in-pithoragarh-on-fast-track\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thenortherngazette.com\/"},{"@type":"ListItem","position":2,"name":"Border roads on Indo-China border in Pithoragarh on fast track"}]},{"@type":"WebSite","@id":"https:\/\/thenortherngazette.com\/#website","url":"https:\/\/thenortherngazette.com\/","name":"Northern Gazette","description":"News Portal","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thenortherngazette.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/thenortherngazette.com\/#\/schema\/person\/4d8ec7be5e8a9073ea862e9fa63c11c4","name":"The Northern Gazette Desk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/db6635bc2f75f96f9a9838ca969d33cb70394750f7d4c8f35adef1a0058200c6?s=96&d=mm&r=g","caption":"The Northern Gazette Desk"},"url":"https:\/\/thenortherngazette.com\/index.php\/author\/the-northern-gazette-desk\/"}]}},"_links":{"self":[{"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/posts\/3370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/comments?post=3370"}],"version-history":[{"count":1,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/posts\/3370\/revisions"}],"predecessor-version":[{"id":3372,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/posts\/3370\/revisions\/3372"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/media\/3371"}],"wp:attachment":[{"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/media?parent=3370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/categories?post=3370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thenortherngazette.com\/index.php\/wp-json\/wp\/v2\/tags?post=3370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}